Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 15 results ...

Adebowale, O J and Agumba, J N (2023) A meta-analysis of factors affecting construction labour productivity in the Middle East. Journal of Construction in Developing Countries, 28(1), 193-220.

Arowoiya, V A and Oyefusi, O N (2023) An analysis of the benefits of adopting modular construction: A Nigerian construction industry context. Journal of Construction in Developing Countries, 28(1), 243-65.

  • Type: Journal Article
  • Keywords: collaboration; government; modular construction; off-site construction; sustainable building; teamwork; training; Nigeria; productivity; project performance; construction project; construction method; architect; client; professional; quantity surveyor
  • ISBN/ISSN:
  • URL: http://web.usm.my/jcdc/vol28_1_2023/jcdc2023.28.1.12.pdf
  • Abstract:
    On site and off site are the main construction methods used in the construction industry with the former being majorly adopted. Off-site construction offers significant opportunity to improve project performance. However, there is little awareness of its benefits in the Nigerian construction industry. This study aims to assess the benefits of adopting modular integrated construction in Nigeria to improve the level of understanding, usage for stakeholders and enhance productivity. Purposive and snowballing technique were used to select the prefab construction experts. Professionals that were involved in the study are engineers, architects and quantity surveyors in the study area. The most rated benefits are enhanced teamwork and collaboration, improved productivity, simplicity and ease in the construction, enhances sustainable building and improved quality of work. Five variables have significant difference between the respondents while the others do not. The study concludes that modular construction is at its nascent stage and could be developed and be more implemented if the government takes the lead. It is therefore recommended that stakeholders must be ready and willing to use modern method for better collaboration and teamwork. Also, more awareness and training programmes should be conducted to the stakeholders who could implement its usage in the Nigerian construction industry. The government should also provide financial support to encourage private clients and other people who are keen to execute the construction projects with prefabs.

Au-Yong, C P, Ali, A S and Pavaraj, A (2023) Prioritising the maintenance of university hostels to improve students’ satisfaction. Journal of Construction in Developing Countries, 28(1), 151-69.

Buhamizo, I, Muhwezi, L and Sengonzi, R (2023) A regression model to enhance the profitability of local construction contractors in Uganda. Journal of Construction in Developing Countries, 28(1), 221-41.

Chigara, B and Moyo, T (2023) The impact of COVID-19 on the construction sector in Zimbabwe. Journal of Construction in Developing Countries, 28(1), 91-111.

Erlita, A, Amin, M and Bintoro, B P K (2023) Multiphase project risk management on food factory building construction: Consultant perspective. Journal of Construction in Developing Countries, 28(1), 1-17.

Kahvandi, Z, Melhado, S and Viana, M L (2023) Solutions to overcome integrated project delivery implementation barriers: A meta-synthesis approach. Journal of Construction in Developing Countries, 28(1), 63-89.

Khamaksorn, A, Nimmolrat, A, Mahat, N and Thinnukool, O (2023) An IDEF0 functional planning model for the development of an asset management framework: A case study of chiang mai university. Journal of Construction in Developing Countries, 28(1), 133-50.

Kikwasi, G J, Sospeter, N G and Rwelamila, P D (2023) Critical success factors for adopting supply chain management in Tanzanian construction projects. Journal of Construction in Developing Countries, 28(1), 43-61.

Mnea, A and Zairul, M (2023) Housing design studies in Saudi Arabia: A thematic review. Journal of Construction in Developing Countries, 28(1), 317-39.

Moyo, T, Mukawa, M, Moyo, C and Chigara, B (2023) Expected competencies of quantity surveyors in Zimbabwe. Journal of Construction in Developing Countries, 28(1), 19-42.

Osman, A M and Liu, Y S (2023) Critical determinants of the competitiveness of the Ghanaian construction industry. Journal of Construction in Developing Countries, 28(1), 267-91.

Parra, H A, Zuñiga-Collazos, A and Cruz-Caicedo, L F (2023) Impact of external risks on international construction projects success: Evidence from commonwealth caribbean islands. Journal of Construction in Developing Countries, 28(1), 113-32.

Powmya, A, Nazirah, Z A and Nurul Sakina, M A (2023) Determination of contractor strategies in delivering construction projects in Oman. Journal of Construction in Developing Countries, 28(1), 293-316.

Yap, J B H and Lim, S Y (2023) Collaborative project procurement in the construction industry: Investigating the drivers and barriers in Malaysia. Journal of Construction in Developing Countries, 28(1), 171-92.